Supply Range and Requirements on Local Installation :
(1) It consists of host, hydraulic station, water station, cleaning system and control system.
(2) This machine must be installed on solid flat reinforced concrete, or steel rack. Consult foundation size and related dimension to installation sketch map and foundation chart. The depth of groundwork is determined by customers according to real conditions. Host should be suspended by professional technicians, avoid the equipment from impacting or scratching. Utilize grad enter to adjust the host during installation, then install other equipments during fastening the host.
(3) Air supply: granule less than 5 um, pressure 0.5-0.6MPa, Air Volume: take assemble chart as reference
(4) Water supply: max. solid contents 5ppm, solid granule less than 50um, pressure 3.5-6bar, take assemble chart as reference for supply volume
(5) Power supply: 3 phase/380V±5%, single phase/220V±5%,50Hz
(6)Working Environment: working environment requirements for this machine , not freeze.